diff --git a/text/0031-corejam.md b/text/0031-corejam.md index fc18ba8..1acacd4 100644 --- a/text/0031-corejam.md +++ b/text/0031-corejam.md @@ -137,7 +137,7 @@ The second consensus computation happens on-chain at the behest of the Relay-cha At some point later `T+r+i+a` (where `a` is the time to distribute the fragments of the Work Package and report their archival to the next Relay-chain Block Author) the Availability Protocol has concluded and the Relay-chain Block Author of the time brings this information on-chain in the form of a bitfield in which an entry flips from zero to one. At this point we can say that the Work Report's Package is *Available*. -Finally, at some point later still `T+r+i+a+o`, the Results of the Work Package are aggregated into groups of Work Classes, and then *Pruned* and *Accumulated* into the common state of the Relay-chain. This process is known as *Integration* (in the fixed-function parachains model, this is known as "inclusion") and is irreversible within any given fork. Additional latency from being made *Available* to being *Integrated* (i.e. the `o` component) may be incurred due to ordering requirements, though it is expected to be zero in the variant of this proposal to be implemented initially (see **Work Package Ordering**, later). +Finally, at some point later still `T+r+i+a+o`, the Results of the Work Package are aggregated into groups of Work Classes, and then *Pruned* and *Accumulated* into the common state of the Relay-chain. This process is known as *Integration* (in the fixed-function parachains model, this is known as "inclusion") and is irreversible within any given fork. Additional latency from being made *Available* to being *Integrated* (i.e. the `o` component) may be incurred due to ordering requirements, though it is expected to be zero in the variant of this proposal to be implemented initially (see **[Work Package Ordering](#work-package-ordering)**, later). ### Collect-Refine